A. CPWD Publication
1. Manual:
1.2 Maintenance Manual : 2019 2023
1.3 Green Rating Manual : 2019 2021
1.4 Quality Assurance Manual (Building Works) : 2022
1.5 Vigilance Manual : 2012
2. Plinth Area Rates:
2.1 Plinth Area Rates : 2012 2019 2020 2021 2023
2.2 Supplement for Specilized E & M Works : 2013 2014
3. Analysis of Rates for Delhi: Civil & Electrical
3.1 Volume-I : 2023
3.2 Volume-II : 2023
4. Schedules of Rates: Civil & Electrical
  5.2  Item for Solar Photovoltaic Power Plant:  2019
  5.3  Items for VRF/VRV Air-Conditioning System:  2019
  5.4  Wet Riser and Sprinkler System: 2019
6. Specifications: Civil
7. Specifications: E&M
  7.2  Part-II External :  2023
  7.4  Part-IV Sub Station :  2013
  7.5  Part-V Wet Riser & Sprinkler Systems :  2020
  7.6  Part-VI Fire Detection and Alarm System :  2018
  7.7  Part-VII D.G. Sets :  2013
  7.8  Part-VIII Gas Based Fire Extinguishing System:  2013
  7.9   General Specifications for Heating, Ventilation & Air-Conditioning (HVAC): 2024
 7.12  General Specification for Modular operation Theater : 2022
 7.13  General Specification for Nurse Call System : 2022
8. Other Publications:
  8.1  Safety Health & Environment :  2019
  8.2  Total Quality Management :  2019
  8.3  Planning of Office Building : 2013
  8.4  Space for Electrical and Machanical Services in Buildings :  2013
  8.5  Quality Assurance Policy & Check List of E & M Services : 2016
  8.6 Guidelines for Substation and Power Distribution Systems of Buildings:  2019
  8.7  Guide for using National Building Code of India: 2016
  8.8  Construction Arbitration - The Indian and International Perspective :  2023
  8.9  Introducing BIM in CPWD :  PDF
B. Bureau of Energy Efficiency (BEE)
1. ECBC Commercial Buildings:
  1.1  ECBC Code              :  PDF
  1.3  ECBC User Manual : PDF
  1.4  ECBC Rules 2018   :  PDF

0 Comments