Mechanical, Electrical & Plumbing (MEP) Analysis

( Backbone of Smart Construction )

CPWD Publication


1.  Manual: 

  1.1  CPWD Works Manual :   
         
Standard Operating Procedures (SOPs) :  

  1.2  Maintenance Manual   :    2023

  1.3  Green Rating Manual  :    2021

  1.4  Quality Assurance Manual (Building Works) : 2022

  1.5  Vigilance Manual :   2012


2.  Plinth Area Rates:

  2.1  Plinth Area Rates :  1992,  2007,  2010,  2012,  2019,  2020,  2021,  2023 2025

  2.2  Supplement for Specilized E & M Works : 2013,  2014


3.  Analysis of Rates for Delhi: Civil & Electrical

  3.1  Volume-I   :   2010,  2012,  2013,  2014,  2016,  2018,  2019,  2021updated till December 2021,  2023, 

  3.2  Volume-II :   2010,  2012,  2013,  2014,  2016,  2018,  2019 , 2021updated till December 2021,  2023

  3.3  E & M      :  2012,  2016,  2018,  2022,  (CS),  2025(V II),  2025(P1),  2025(P2),  2025(P3 ),  (CS)2025, 


4.  Schedules of Rates: Civil & Electrical

  4.1  Volume-I   :   2016,  2018,  2021updated till December 2021,  2023

  4.2  Volume-II :   2016,  2018,  2021 updated till December 2021,  2023

  4.3  DSR (Civil):  2002 PDF,  2002 XLS,  2007,  2010,  2012,  2012 (Supplement),  2013,  2014

  4.4  DSR (E & M):    2014  2016  2018  2022  (C S),  2025 (V-II)  2025 (by 08/25 ) 2025(C S) 


 5.  DSR & AOR: E&M

  5.1  Item for BEE 5 star rated, ceiling fan with Brush Less Direct Current Motor :   2019

  5.2  Item for Solar Photovoltaic Power Plant:   2019

  5.3  Items for VRF/VRV Air-Conditioning System:   2019

  5.4  Wet Riser and Sprinkler System:  2019

6. Specifications: Civil 

  6.1  Specifications Volume I :  2009,  2019

  6.2  Specifications Volume II -  2009,  2019

7. Specifications: E&M

  7.1  Part-I Internal :   2005,  2013,  2013 (Amendments),  2023,  2023 ( Amendments)

  7.2  Part-II External : 1994,  2023

  7.3  Part-III-Lift & Escalators :   2003,  Amendment No. 1

  7.4  Part-IV Sub Station : 2013

  7.5  Part-V Wet Riser & Sprinkler Systems :   2020

  7.6  Part-VI Fire Detection and Alarm System :   2018

  7.7  Part-VII D.G. Sets :  2013,  Amendment (05.11.2024)

  7.8  Part-VIII Gas Based Fire Extinguishing System:   English,   2013 हिन्दी

  7.9   Heating, Ventilation & Air-Conditioning (HVAC):  2004,  2017,  2017 (Amendments),  2024

 7.10  Medical Gas Pipe System:  2022 

 7.11  Pneumatic Tube Transport System:  2022

 7.12  Modular operation Theater : 2022

 7.13  Nurse Call System :  2022

8. Other Publications:

  8.1  Safety Health & Environment :   2019

  8.2  Total Quality Management :   2019

  8.3  Planning of Office Building :  2013
  
  8.4  Space for Electrical and Machanical Services in Buildings :  2013

  8.5  Quality Assurance Policy & Check List of E & M Services : 2016

  8.6 Guidelines for Substation and Power Distribution Systems of Buildings:  2019

  8.7  Solar Power And Energy Efficiency In Government Buildings:  2019

  8.8  Guide for using National Building Code of India 2016:   Pdf

  8.9  Introducing BIM in CPWD -  Pdf








Post a Comment

0 Comments