CPWD Plinth Area Rate (PAR 2025) Cost Estimator
▼ Advanced Structural & Civil Adjustments
▼ Specialized Fire Safety & Alarm Services
Preliminary Cost Estimate (PAR 2025)
| Preliminary Sub-Head | Estimated Cost (\u20B9) |
|---|---|
| 1.0 Building Civil Work (Base) | -- |
| 1.3 Multi-Storey/Civil Extras | -- |
| 1.5 & 1.6 Fire Fighting & Alarm Systems | -- |
| Total Building Cost (Sub-Head 1.0) | -- |
| 2.0 Internal & External E&M Services | -- |
| 3.0 TPQA & Consultancy Markups (2.75%) | -- |
| Grand Estimated Cost (Base Index) | -- |
| Estimated Cost (Adjusted for Cost Index) | -- |
CPWD PAR 2025 Compliance Guidelines:
- The Base Standard: Base rates compiled as of **01.04.2025 as 100**. Sized with standard floor heights of **3.60m** for non-residential and **3.00m** for residential.
- Multi-Storey Floor Escalation: For structures higher than 6 storeys, a cumulative extra rate of **\u20B9123 per sqm** is applied for every set of 6 additional floors (e.g., \u20B9123/sqm for floors 7–12, \u20B9246/sqm for floors 13–18).
- Services Exclusions: Per CPWD Clause 2.0, internal and external electrical/sanitary services percentages are calculated on the core building cost, strictly **excluding** ground-level extras (raft, pile, deep foundations) and specialized fire safety services.
0 Comments