Concrete Calculator

Concrete Calculator

Work out concrete volume for a slab, footing, column or wall, then get the cement, sand and aggregate quantities needed for your chosen mix — with bag counts and an optional cost estimate.

Shape:

Leave Number of units, Wastage and the custom ratio boxes empty to use 1 unit, 5% wastage and the ratio shown for the selected grade.

WET CONCRETE VOLUME
--m³
DRY VOLUME (WITH BULKAGE)
--m³
Dry volume = Wet volume × 1.54
CEMENT REQUIRED
--bags
SAND REQUIRED
--m³
AGGREGATE REQUIRED
--m³
WATER REQUIRED (approx.)
--litres
At 0.45 water-cement ratio
CONCRETE VOLUME (OTHER UNITS)
--ft³
ESTIMATED MATERIAL COST
--

Optional: Estimate Cost

Fill in local rates and press Calculate again to see the estimated cost above. Leave blank to skip the cost estimate.

Note:
  • Dry Volume Factor: Wet (poured) concrete settles and loses volume to voids once it sets, so the dry material volume is taken as 1.54 × the wet volume, the standard allowance used in Indian practice.
  • Cement Bag Volume: One 50 kg bag of cement occupies 0.0347 m³ at a bulk density of 1440 kg/m³.
  • Sand & Aggregate Density: Sand is taken at 1600 kg/m³ and coarse aggregate at 1450 kg/m³ for the weight figures shown.
  • Wastage: The default 5% wastage allowance covers spillage, over-excavation and uneven sub-grade; increase it for hand-mixed or difficult pours.

Reference Guide: Concrete Volume & Mix Design

1. Volume Formulas by Shape

ShapeFormula
Slab / FootingVolume = Length × Width × Thickness
Round ColumnVolume = π × (Diameter / 2)² × Height
Square / Rectangular ColumnVolume = Width × Depth × Height
WallVolume = Length × Height × Thickness

2. Standard Concrete Mix Ratios (Nominal Mix)

GradeRatio (Cement : Sand : Aggregate)Typical Use
M101 : 3 : 6Levelling course, PCC bedding
M151 : 2 : 4PCC, light footings, flooring base
M201 : 1.5 : 3RCC slabs, beams, columns (general RCC work)
M251 : 1 : 2RCC for higher loads, water-retaining structures

3. Material Quantity Formulas

Dry Volume (m³) = Wet Volume × 1.54
Cement Volume (m³) = Dry Volume × Cement Ratio / Sum of Ratio
Cement (Bags) = Cement Volume / 0.0347
Sand (m³) = Dry Volume × Sand Ratio / Sum of Ratio
Aggregate (m³) = Dry Volume × Aggregate Ratio / Sum of Ratio

For M20 (1:1.5:3), the sum of ratio parts is 5.5. So for 1 m³ of wet concrete: Dry volume = 1.54 m³. Cement = 1.54 × (1/5.5) = 0.28 m³ = about 8.1 bags. Sand = 1.54 × (1.5/5.5) = 0.42 m³. Aggregate = 1.54 × (3/5.5) = 0.84 m³.

4. Water-Cement Ratio

A water-cement ratio of 0.45 to 0.50 is typical for structural RCC work. This calculator uses 0.45 to estimate mixing water: Water (litres) = Cement weight (kg) × 0.45. Site conditions, aggregate moisture and workability requirements may call for adjustment; always follow your project's approved mix design over a nominal-mix estimate for critical structural elements.